Umberslade

IndustrialSoft Strip Out Internal Demolition M&E Strip Out Groundworks
sq. ft41,000
Duration20 Weeks
LocationBirmingham
Site ManagerJohn Treacy

Project Summary

Combined strip out and groundworks project at large data centre & offices

Schedule of Work

Strip Out:
Strip out floor finishes, raised floors & suspended ceilings
Remove HVAC system, radiators, sanitaryware
Remove electrical & data services equipment & cabling
Remove & disposed of wall finishes inc. tiles
Demolish covered walkway, curtain walling & block walls
Remove fixtures & fittings inc. windows, doors, panels, frames, glazing

Groundworks:
Excavation & filling with earthwork supports
Preparations for installation of storm drainage
Landscaping; clearance of vegetation & excavation
Installation of fencing
Concrete slab foundations

Time-lapse Video

Concrete pour on Ground Ring Beams

Minimum fuss. Maximum service.

We’re dedicated to mimimising fuss and maximising our level of service.
SnagZero embodies our commitment to minimise risk, error & complication and maximise expertise, efficiency & safety to reliably deliver a high-quality project.

Get a Quote

Have a programme like this?